Our Pelican Waters client’s had owned their house on the canal for a few years with renovating it in mind. After meeting with multiple architects and builders, they settled on us to renovate their existing pool and spa, build an extension of their outdoor area and renovate their kitchen, butler’s pantry, ensuite and walk-in robe. They only had a very rough idea of the look they wanted to achieve, so our first step was to put them directly in contact of our award winning building designer and only a couple of weeks later all plans were drawn and we were ready to start building their dream.

Inside, we had to completely demolish the ensuite, walk-in rob, kitchen and panty all while protecting the polished timber flooring and remainder of the house. Outside, we completely stripped the pool coping, over 100m² of tiled surrounds and some decking before we could start the re-construction.

The pool renovation included numerous upgrades such as removal of an existing stainless-steel bridge and construction of stepping stones with LED strip light under, fully tiling the existing spa and finishing the pool in Blue Glass Pebble. We used a 400x400x30mm Travertine coping tile which then transitioned into matching Travertine laid in a French Pattern to the surrounds of the pool and outdoor area.

 

  • Coping Tile – 400x400x30mm ‘Ivory Travertine
  • Waterline Tile – 20x20mm Glass Mosiac
  • Spa – 20x20mm Ceramic Black
  • Pebblecrete – Blue Glass Pebble Company – Pacific