DESIGN

Serenity Pool Co. works exclusively with Shane from Kunkel Building Design. Shane has over 18 years experience and has worked on a wide range of residential and commercial design projects which have reflected successfully in multiple  categories of the annual Queensland Building Design Awards. Shane strives to maintain an innovative yet environmentally responsible outlook and offers experience in all stages of production and delivery from concept design, building documentation, construction consultant coordination and council liaison.

A RIGOROUS PROCESS EXPLAINED STEP BY STEP

STEP 1: DESIGN & QUOTATION

After meeting with our director, he will draw a quick sketch of your desired project and send it through along with our quotation. Once you have accepted the quote and signed a contract, Shane our building designer, will design the final plan for your approval.

STEP 2: ENGINEERING PLAN, COUNCIL APPROVAL & CERTIFICATION

Once you have approved the design, we will send the plans through to our engineer and certifier. This step usually takes between two to three weeks.

STEP 3: EXCAVATION

After receiving council approval we will be ready to start the excavation of your pool. This generally takes two days, but depends on the size and shape of your pool.

STEP 4: STRUCTURAL SHELL & INTERNAL PLUMBING

Once the excavation is complete, our team will form and steel the structural shell along with installing the plumbing to prepare for the concrete spraying. This process usually takes about a week.

STEP 5: CONCRETE SPRAYING

After our team have finished, the concretors will spray a 32mpa spray mix to the wall & floor of your pool, which is then shaped. The concrete shell needs a minimum of two weeks to cure before the tiling can start and four weeks before it can be pebbled. This step is completed within a few hours.

STEP 6: COPING & LANDSCAPING

When the concrete is cured our award winning tiler can start the coping and waterline of your pool. Any surrounding landscaping will be completed at the same time and the fence will be installed and inspected by our private certifier.

STEP 7: PEBBLE INTERIOR & FULLY TILED POOLS

This is when the filtration system will be installed and if you choose a pebble interior it will be sprayed within a few hours. The pebblers will then come back the next day to acid wash the pebble and begin filling the pool. Fully tiled pools will continue on from the previous stage, however typically this will take an extra few weeks before they are completed and ready to fill. If you would like more information on this process feel free to give us a call.

STEP 8: START UP & HANDOVER

Once the pool is full, we will arrange to have the pool commissioned. This include cleaning the pool, starting up the pump, filter and chlorinator and chemically balancing the pool.
At this time our pool technician will give you a thorough run through of the operation and maintenance of your new swimming pool and filtration system. He will also be available to call should you have any questions down the track. After the completion of your new swimming pool, be reassured that will always be available to call or email if you have any questions.
Find out about our Guarantee